Skip to content
Eco-Markets.

Proponents

Participants

Proponents and project developers

The organisations developing projects under Eco-Markets standards. Filter by standard to see who works where.

4 participants

Proponents and Project Developers

Cassowary Coast Regional Council

Cassowary Coast Regional Council is a local government organisation in Far North Queensland, located between the Great Barrier Reef and the Wet Tropics World Heritage Area.

Council established the region’s first carbon credit project and the first Cassowary Credits project ever registered and planted. Delivering rainforest reforestation on Mamu Country in partnership with the Mamu People and students from Innisfail State College, Council is restoring degraded land and strengthening habitat for native species.

The project serves as a real-world demonstration for landholders, government agencies and organisations seeking to explore a similar pathway in reforestation and environmental markets.

Michael Anderson, Manager of Natural Environment and Sustainability 0482 845 019 michael.anderson@ccrc.qld.gov.au

Visit website — Cassowary Coast Regional Council, opens in a new tab

Proponents and Project Developers

Jabalbina

Jabalbina represents the Eastern Kuku Yalanji (EKY) People, whose Country extends from Port Douglas to near Cooktown in Far North Queensland, including the entire Daintree region.

Jabalbina is the EKY People’s Registered Native Title Body Corporate, primary land trust and registered Cultural Heritage Body.

Jabalbina manages the EKY Indigenous Protected Area, EKY Rangers and other programs for the benefit of EKY People and Country.

This project meets EKY aspirations to care for and restore Country while generating income and building the capacity of First Nations people for land restoration work.

Jabalbina is replanting a section of the Daintree River’s riparian corridor to generate Cassowary Credits using the Rainforest Replanting Methodology.

Rowan Shee – Green Economy Strategy Project Manager 0458 875 745 rowanshee@jabalbina.com.au

Visit website — Jabalbina, opens in a new tab

Proponents and Project Developers

Rainforest Rescue

Based in Far North Queensland, Rainforest Rescue is a not-for-profit environmental organisation undertaking on-ground conservation in the Daintree. Since 1999, the organisation has protected and restored rainforest by purchasing high-conservation-value properties, safeguarding biodiversity, and carrying out restoration activities including tree planting, maintenance, and weed removal.

Rainforest Rescue's Cassowary Credit project is located within the Daintree Oxbow, a floodplain landscape linking two world heritage areas, and connecting the Daintree River and Australia's most biodiverse mangrove system. It is currently one of the most significant restoration project in Australia's Wet Tropics. Much of the Oxbow was cleared for sugarcane farming over the past seventy years and remains severely degraded and fragmented. Restoring the Oxbow reconnects the wildlife corridor between the Daintree National Park and the river system, providing habitat for a range of threatened species such as the Southern Cassowary and Spectacled Flying Fox as well as plenty of other threatened birds, mammals, reptiles and amphibians.

The restoration work also rebuilds soil health, improves water quality flowing into the Great Barrier Reef catchment, increases carbon storage and biodiversity, and supports local jobs in seed collection, nursery production and on ground revegetation work.

Tate Brammer 0409 112 186 tate@rainforestrescue.org.au

Visit website — Rainforest Rescue, opens in a new tab

Proponents and Project Developers Method Developers

Verterra Ecological Engineering

Verterra is a leading ecological engineering firm helping landholders and organisations to combine grazing extension, reforestation and landscape restoration with the generation of Reef, Cassowary and ACWIS Credits.

We develop scientifically robust methodologies and design projects that deliver landscape productivity as well as creditable environmental outcomes – all measured and verified through our DROVER Monitor benchmarking, mapping and monitoring system.

Why Work With Us

- Full project support from scoping through to registry-ready documentation and verification.
- Transparent, traceable credits with real market value.
- Dedicated support for landholders and investors to maximise project outcomes through our specialised DROVER Land Management service.

Andrew Yates – Sector Lead Ecosystem Services 0423 976 501 andrew.yates@verterra.com.au

Visit website — Verterra Ecological Engineering, opens in a new tab